UNICEF-San Isidro Project
Supply and installation of submersible pump, pump discharge and accessories, chlorination equipment and electrical panel. Construction of well neck and civil works.
Supply and installation of submersible pump, pump discharge and accessories, chlorination equipment and electrical panel. Construction of well neck and civil works.
Supply and installation of 15 multistage vertical centrifugal pumps from 40 to 150 HP , with 16” suction and discharge line, 4 motor control centers, 4 generators from 100 to 1500 KVA, 4 transformer banks with capacities from 300 to 600 KVA, including the electrical transmission lines for the same. This was done in the Chaguitillo, Cuatro Esquinas, tejas de Matagalpa y Llano de la Cruz, Jinotega.
Supply and installation of 12 submersible pumps complete with column pipe, pump discharge, electric panels control, emergency generators.
Supply and installation of complete vertical turbine pumps, including the complete pumping station and the emergency generator.
Supply and installation of 5 complete submersible pumping equipment including pump discharge and accessories, electrical control panels, electrical transmission lines and their respective transformer banks.
Supply and installation of 5 complete submersible pumps. Including pump discharge and all accessories , electrical control panels, electrical transmission lines with respective transformer banks.
Supply and installation of submersible pumping equipment complete with pressure tanks and hydropneumatic system.
Supply and installation of 18 sewage pumping units. Including pumping discharge and accesories. motor control center and electrical control panels with PLC automation and transformer banks; 6 bridge cranes for operating and mantaining stations.
Pumping equipment supply (submersible, vertical, horizontal and wastewater); column pipe, accesories of the water network and the pumping discharge, Electric control panel, load centers, electrical transformers and generators.